The Planning & Development component of the Division of Parks and Recreation oversees new projects around the state within the Division's management area. Check here for a list of Requests for Proposals and Requests for Qualifications, posted on behalf of the Division.

Single Beam Guardrail Replacement

Project Name: Single Beam Guardrail Replacement at Hampton Beach State Park, Hampton, NH
Mandatory Pre-bid Meeting: April 4, 2023 at 10:00 am sharp. Prebid meeting will be held in the parking across north of the NH Marine Memorial, across from the Ocean Spray Café.
Bids Due: Thursday, April 13, 2023 at 2:00 pm
Start Date: May 17, 2023
Completion Date: No later than November 1, 2023

CAP-2301 Single Beam Guardrail Hampton Beach
CAP-2301 Guardrail - SKT Alternate
CAP-2301 Guardrail - MSKT
CAP-2301 Guardrail - MATT Sheets 1 & 2 
CAP-2301 Guardrail - Sheets 1thru 7
CAP-2301Addendum 1
CAP-2301 Addendum 2
CAP-2301 Mandatory Pre-bid List


Storm Debris Removal Request for Bid

Project Name: Storm Debris Removal at Hampton Beach State Park, Hampton NH,
Rye Harbor State Park, Rye NH, Odiorne Point State Park, Rye NH
Issue Date: March 22, 2023
Response Date: Thursday, April 6, 2023 at 2:00 pm
Anticipated Start Date: May 19, 2023
Completion Date: June 16, 2023

OPS-2302 Specifications
OPS - 2302 Addendum 1


Request for Qualifications Wentworth Coolidge Historic Site

Project Name: Conditions Assessment with Treatment Recommendations for Wentworth-
Coolidge Mansion State Historic Site.
Issue Date: February 15, 2023
Response Date: March 8, 2023
Anticipated Start Date: May 31, 2023

WCM Condition Asssessment Request for Qualifications
 

Golf Cart 2 year Seasonal Rental Request for Bid

Project Name: Golf Cart 5 year Seasonal Rental for New Hampshire State Parks
Bid Due: Thursday, February 23, 2023, at 2:00 PM
Delivery Date: Monday, June 1, 2023, at 2:00 PM

OPS -2302 Golf Cart Seasonal Rental Specifications
 

Metal Roof Replacement Request for Bid

Project Name: Metal Roofing Replacements North Country Resources Center Lancaster, NH

Location: Pole Barns at North Country Resources Center, 629 N. Main St., Lancaster, NH, 03584 
Mandatory Prebid Meeting: Tuesday February 14, 2023 at 11:00 am
Bid Opening: Thursday February 23, 2023 at 2:00 pm
Anticipated Start Date: April 12, 2023 
Completion Date: No later than August 31, 2023

CAP 2218 Metal Roof Replacements NRC Lancaster Specifications
CAP 2218 Metal Roof Replacements NRC Lancaster Sheet 1of 3 
CAP 2218 Metal Roof Replacements NRC Lancaster Sheet 2of 3
CAP 2218 Metal Roof Replacements NRC Lancaster Sheet 3 of 3
 

Hampton Beach Grading - Request for Bid

Project Name: Beach Grading, Hampton Beach State Park, Hampton, NH
Mandatory Prebid Meeting: January 24, 2023 at 11:00 am outside of the Hampton Beach Meter Patrol Office.
Bids Due: February 2, 2023 at 2:00 PM
Start Date: April 15, 2023
Completion Date: May 5, 2023

OPS-2216 Hampton Beach Grading Specifications
 


Asphalt Shingle Roof Replacement Request for Bid

Project Name: Asphalt Shingle Roof Replacement and Repairs for the Barn at Lake Tarleton State Park 
Location: 894 Lake Tarleton RD. Piermont, NH 03779
Mandatory Prebid Meeting: Tuesday October 25, 2022 at 10:00 am
Bid Due: Thursday, November 3 at 2:00 PM
Anticipated Start Date: December 7, 2022 
Completion Date: No later than June 30, 2023

CAP 2208 Lake Tarleton State Park Asphalt Shingle Roof Replacement Sheet 1of 1
CAP 2208 Lake Tarleton State Park Asphalt Shingle Roof Replacement Specifications


Request for Bid Phase 1A Survey, Greenfield State Park: Archaeological Sensitivity Assessment

The State of New Hampshire, Department of Natural and Cultural Resources, Division of Parks and Recreation is soliciting bids from qualified parties to prepare an Phase 1A Archaeological Sensitivity Assessment per NH Division of Historical Resources standards and guidelines for areas at Greenfield State Park.
The Division is proposing to replace the existing underground water system, install new utility poles for overhead service and bury the existing above ground electric utilities at Greenfield State Park. Consultants shall be 36 CFR Part 61 qualified.

Responses Date: 12:00pm, Wednesday October 26, 2022.

Greenfield State Park Phase 1A
Appendix A
Appendix B


Request for Qualifications

The State of New Hampshire, Department of Natural and Cultural Resources is soliciting qualification statements to prepare a Conditions Assessment with Treatment Recommendations for Fort Constitution State Historic Site. All work to be completed following the Secretary of the Interior’s Standards for Preservation.

Issue Date: October 5, 2022
Response Date: November 2, 2022
Anticipated Start Date: February 1, 2023

Fort Constitution Conditions Assessment-Treatment RFQ


Asphalt Shingle Roof Replacement Request for Bid

The State of New Hampshire, Department of Natural and Cultural Resources, Division of Parks and Recreation is soliciting bids from qualified parties to replace the roof of the Administration Building at Greenfield State Park with asphalt shingles. 

Project Name: Asphalt Shingle Roof Replacement, Greenfield State Park Administration Building
Location: 52 Campground Rd., Greenfield, NH 03047
Mandatory Prebid Meeting: Tuesday, October 11, 2022 at 10:00 am, Greenfield State Park Administration Building
Bid Due: October 20, 2022 at 2:00 PM
Anticipated Start Date: November 22, 2022 
Completion Date: No later than June 30, 2023

CAP Greenfield State Park Admin. Building Roof Replacement Sheet 2206 - 1
CAP 2206 Greenfield State Park Admin. Building Roof Replacement Sheet 2206 - 2
CAP 2206 Greenfield State Park Admin. Building Roof Replacement Specifications


Asphalt Shingle Roof Replacement Request for Bid

The State of New Hampshire, Department of Natural and Cultural Resources, Division of Parks and Recreation is soliciting bids from qualified parties to replace the roof of the Headquarters Building at Cannon Mountain with asphalt shingles. 


The Project will be awarded to Innovative Roofing NH in the amount of $44,725 Pending Approval by Governor and Executive Council:
Bid List


Project Name: Asphalt Shingle Roofing Replacement Cannon Mt. Headquarters Building 
Location: 260 Tramway Drive, Franconia/Lincoln, NH 03580
Mandatory Prebid Meeting: Sept. 13, 2022 at 10:00 am at the Cannon HQ Building
Bid Due: September 22, 2022 at 2:00 PM
Start Date: October 19, 2022 
Completion Date: No later than June 30, 2023


CAP Cannon HQ Roof Replacement Sheet 2205 - 1
CAP Cannon HQ Roof Replacement Sheet 2205 - 2
CAP 2205 Roof Replacement Specifications


Asphalt Shingle Roof Replacement Request for Bid

The State of New Hampshire, Department of Natural and Cultural Resources, Division of Parks and Recreation is soliciting bids from qualified parties to replace the roof of the Administration Building at Moose Brook State Park in Gorham, NH  with asphalt shingles. 

Project Name: Asphalt Shingle Roof Replacement for Administration Building 
Location: Moose Brook State Park, Gorham, NH
Mandatory Prebid Meeting: August 30, 2022 at 10:00 am sharp, Moose Brook State Park
Bid Due: September 8, 2022 at 2:00 PM
Start Date: October 4, 2022 
Completion Date: May 12, 2023

CAP Roof Replacement Sheet 2204 - 1
CAP Roof Replacement Sheet 2204 - 2
CAP 2204  Roof Replacement Specifications


NH Division of Parks & Recreation &
Cannon Mountain Ski Area
Advertising Agency Services Request for Proposals

Request for Proposals Issued Friday, May 6, 2022
Deadline for Questions Monday, May 16, 2022
Responses to Questions Friday, May 23, 2022
Written Proposal Deadline Monday, June 6, 2022
Invitations to Present Friday, June 10, 2022
Oral Presentations Friday, June 17, 2022
Award Announcement Tuesday, June 21, 2022
Contractual Process June 2022 Governor & Council Approval Process July 2022
Contract Effective Upon Governor & Council Approval 2022

Advertising Agency Services Request for Proposals

The NH Department of Natural & Cultural Resources, Division of Parks and Recreation, is soliciting proposals for marketing and merchandising services. Historically, the marketing services have been provided for NH State Parks under the Division of Travel and Tourism marketing contract for entire the State of NH and marketing services for Cannon Mountain Ski Area have been provided under a separate contract with an independent vendor. The selected vendor will have the responsibility providing marketing services covering the entire park system under strategies that create synergies across all venues while recognizing the scale and specific needs of marketing a ski area. A more detailed description including scope of work is provided in “Scope of Work and Contract" Information.


Hampton Beach Solid Waste Collection and Disposal 2022

Project #: HB03-22
Bids Are Due: April 11, 2022 at 2:00 PM (EST)
Estimated Start Date: May 27, 2022
STATE OF NEW HAMPSHIRE BID TRANSMITTAL LETTER


Mobile Food Service Concession

Location: Odiorne Point State Park - Rye, NH
Proposals due: March 7, 2022 (Week of March 14th – Interviews)
Anticipated vendor selection: March 22, 2022; Start of contract negotiations
Anticipated start date: Contract start date May 1, 2022. This is a one (1) year contract, pending 

NH State Parks is seeking written proposals from firms to operate a food service concessions truck at Odiorne Point State Park. The contracted concessionaire will be situated at a location that is the least impactful to the park and most effective for the concessionaire. The location will be exclusive to the vendor and run the duration of the season. Odiorne has seen a surge in visitation with 46,349 visitors in 2019, 62,027 visitors in 2020, and 95,655 in 2021. Visitation is to the state park and Seacoast Science Center.


Parking Enterprise System 

NH State Parks is looking for a qualified Parking Enterprise System Solution including required hardware, software, spare parts, paper materials, and technical system support and maintenance as part of a turn-key solution. 

Project#: DNCR – 2022-065
Closing Date: March 21, 2022, 2:00 PM


Engineering and Survey Services for Snowmobile Bridge Abutment and Approach Designs

Location: White Mountain National Forest
Project #: RFQ TB-2201
Qualifications statement due: 3/2/2022, 2:00 PM
Interviews of short listed candidates: 3/16/2022
Contract award: 4/13/2022
Anticipated project start: 7/1/2022
Project design completion: 12/30/2022
Overview: Engineering firms are invited to submit a Statement of Qualifications to design and develop site-specific, engineered plans to replace abutments on two existing snowmobile bridges on the snowmobile trail known as “Corridor 19” (on McDonough Brook Rd/Country Rd.) also known as Nation Forest Service Road 244 in Chatham NH within the White Mountain National Forest (WMNF).


Asphalt Shingle Roof Replacement


The Project will be awarded to Triple Construction LLC in the amount of $38,790.
Bid List

Location: Fernald Station, 64 Governor Wentworth Highway Route 109, Wolfeboro, NH
Project #: CAP-2203
Mandatory Prebid: September 20, 2022 at 10:00 am 
Bids Due: September 29, 2022 at 2:00 pm. 
Anticipated Start Date: October 19, 2022
Completion Date: no later than June 30, 2023

Plans and Specifications located on NH Dept. of Administrative Services site


Previous RFP and Project Bids


The below forms should be used in any project posted:

  • Certificates of Authority:
  • Vendor Application and W9  
  • P-37 Standard Contract Form

    RFPS & PROJECTS

    The Planning & Development component of the Division of Parks and Recreation oversees new projects around the state within the Division's management area. Check here for a list of Requests for Proposals and Requests for Qualifications, posted on behalf of the Division.

    Golf Cart 5 year Seasonal Rental Request for Bid

    Project Name: Golf Cart 5 year Seasonal Rental for New Hampshire State Parks
    Bid Due: Thursday, November 17, 2022 sharp
    Delivery Date: Monday, May 1, 2023

    OPS -2213 Golf Cart Seasonal Rental


    Asphalt Shingle Roof Replacement Request for Bid


    Project Name: Asphalt Shingle Roof Replacement and Repairs for the Barn at Lake Tarleton State Park 
    Location: 894 Lake Tarleton RD. Piermont, NH 03779
    Mandatory Prebid Meeting: Tuesday October 25, 2022 at 10:00 am
    Bid Due: Thursday, November 3 at 2:00 PM
    Anticipated Start Date: December 7, 2022 
    Completion Date: No later than June 30, 2023

    CAP 2208 Lake Tarleton State Park Asphalt Shingle Roof Replacement Sheet 1of 1
    CAP 2208 Lake Tarleton State Park Asphalt Shingle Roof Replacement Specifications


    Request for Bid Phase 1A Survey, Greenfield State Park: Archaeological Sensitivity Assessment

    The State of New Hampshire, Department of Natural and Cultural Resources, Division of Parks and Recreation is soliciting bids from qualified parties to prepare an Phase 1A Archaeological Sensitivity Assessment per NH Division of Historical Resources standards and guidelines for areas at Greenfield State Park.
    The Division is proposing to replace the existing underground water system, install new utility poles for overhead service and bury the existing above ground electric utilities at Greenfield State Park. Consultants shall be 36 CFR Part 61 qualified.

    Responses Date: 12:00pm, Wednesday October 26, 2022.

    Greenfield State Park Phase 1A
    Appendix A
    Appendix B


    Request for Qualifications

    The State of New Hampshire, Department of Natural and Cultural Resources is soliciting qualification statements to prepare a Conditions Assessment with Treatment Recommendations for Fort Constitution State Historic Site. All work to be completed following the Secretary of the Interior’s Standards for Preservation.

    Issue Date: October 5, 2022
    Response Date: November 2, 2022
    Anticipated Start Date: February 1, 2023

    Fort Constitution Conditions Assessment-Treatment RFQ


    Asphalt Shingle Roof Replacement Request for Bid

    The State of New Hampshire, Department of Natural and Cultural Resources, Division of Parks and Recreation is soliciting bids from qualified parties to replace the roof of the Administration Building at Greenfield State Park with asphalt shingles. 

    Project Name: Asphalt Shingle Roof Replacement, Greenfield State Park Administration Building
    Location: 52 Campground Rd., Greenfield, NH 03047
    Mandatory Prebid Meeting: Tuesday, October 11, 2022 at 10:00 am, Greenfield State Park Administration Building
    Bid Due: October 20, 2022 at 2:00 PM
    Anticipated Start Date: November 22, 2022 
    Completion Date: No later than June 30, 2023

    CAP Greenfield State Park Admin. Building Roof Replacement Sheet 2206 - 1
    CAP 2206 Greenfield State Park Admin. Building Roof Replacement Sheet 2206 - 2
    CAP 2206 Greenfield State Park Admin. Building Roof Replacement Specifications


    Asphalt Shingle Roof Replacement Request for Bid

    The State of New Hampshire, Department of Natural and Cultural Resources, Division of Parks and Recreation is soliciting bids from qualified parties to replace the roof of the Headquarters Building at Cannon Mountain with asphalt shingles. 


    The Project will be awarded to Innovative Roofing NH in the amount of $44,725 Pending Approval by Governor and Executive Council:
    Bid List


    Project Name: Asphalt Shingle Roofing Replacement Cannon Mt. Headquarters Building 
    Location: 260 Tramway Drive, Franconia/Lincoln, NH 03580
    Mandatory Prebid Meeting: Sept. 13, 2022 at 10:00 am at the Cannon HQ Building
    Bid Due: September 22, 2022 at 2:00 PM
    Start Date: October 19, 2022 
    Completion Date: No later than June 30, 2023


    CAP Cannon HQ Roof Replacement Sheet 2205 - 1
    CAP Cannon HQ Roof Replacement Sheet 2205 - 2
    CAP 2205 Roof Replacement Specifications


    Asphalt Shingle Roof Replacement Request for Bid

    The State of New Hampshire, Department of Natural and Cultural Resources, Division of Parks and Recreation is soliciting bids from qualified parties to replace the roof of the Administration Building at Moose Brook State Park in Gorham, NH  with asphalt shingles. 

    Project Name: Asphalt Shingle Roof Replacement for Administration Building 
    Location: Moose Brook State Park, Gorham, NH
    Mandatory Prebid Meeting: August 30, 2022 at 10:00 am sharp, Moose Brook State Park
    Bid Due: September 8, 2022 at 2:00 PM
    Start Date: October 4, 2022 
    Completion Date: May 12, 2023

    CAP Roof Replacement Sheet 2204 - 1
    CAP Roof Replacement Sheet 2204 - 2
    CAP 2204  Roof Replacement Specifications


    NH Division of Parks & Recreation &
    Cannon Mountain Ski Area
    Advertising Agency Services Request for Proposals

    Request for Proposals Issued Friday, May 6, 2022
    Deadline for Questions Monday, May 16, 2022
    Responses to Questions Friday, May 23, 2022
    Written Proposal Deadline Monday, June 6, 2022
    Invitations to Present Friday, June 10, 2022
    Oral Presentations Friday, June 17, 2022
    Award Announcement Tuesday, June 21, 2022
    Contractual Process June 2022 Governor & Council Approval Process July 2022
    Contract Effective Upon Governor & Council Approval 2022

    Advertising Agency Services Request for Proposals

    The NH Department of Natural & Cultural Resources, Division of Parks and Recreation, is soliciting proposals for marketing and merchandising services. Historically, the marketing services have been provided for NH State Parks under the Division of Travel and Tourism marketing contract for entire the State of NH and marketing services for Cannon Mountain Ski Area have been provided under a separate contract with an independent vendor. The selected vendor will have the responsibility providing marketing services covering the entire park system under strategies that create synergies across all venues while recognizing the scale and specific needs of marketing a ski area. A more detailed description including scope of work is provided in “Scope of Work and Contract" Information.


    Hampton Beach Solid Waste Collection and Disposal 2022

    Project #: HB03-22
    Bids Are Due: April 11, 2022 at 2:00 PM (EST)
    Estimated Start Date: May 27, 2022
    STATE OF NEW HAMPSHIRE BID TRANSMITTAL LETTER


    Mobile Food Service Concession

    Location: Odiorne Point State Park - Rye, NH
    Proposals due: March 7, 2022 (Week of March 14th – Interviews)
    Anticipated vendor selection: March 22, 2022; Start of contract negotiations
    Anticipated start date: Contract start date May 1, 2022. This is a one (1) year contract, pending 

    NH State Parks is seeking written proposals from firms to operate a food service concessions truck at Odiorne Point State Park. The contracted concessionaire will be situated at a location that is the least impactful to the park and most effective for the concessionaire. The location will be exclusive to the vendor and run the duration of the season. Odiorne has seen a surge in visitation with 46,349 visitors in 2019, 62,027 visitors in 2020, and 95,655 in 2021. Visitation is to the state park and Seacoast Science Center.

  • Odiorne Food Service Concession RFP Details

  • Parking Enterprise System 

    NH State Parks is looking for a qualified Parking Enterprise System Solution including required hardware, software, spare parts, paper materials, and technical system support and maintenance as part of a turn-key solution. 

    Project#: DNCR – 2022-065
    Closing Date: March 21, 2022, 2:00 PM
  • Parking Enterprise System RFP
  • Requirements and Deliverables (excel file)
  • RFP Addendum
  • RFP Addendum 2

  • Engineering and Survey Services for Snowmobile Bridge Abutment and Approach Designs

    Location: White Mountain National Forest
    Project #: RFQ TB-2201
    Qualifications statement due: 3/2/2022, 2:00 PM
    Interviews of short listed candidates: 3/16/2022
    Contract award: 4/13/2022
    Anticipated project start: 7/1/2022
    Project design completion: 12/30/2022
    Overview: Engineering firms are invited to submit a Statement of Qualifications to design and develop site-specific, engineered plans to replace abutments on two existing snowmobile bridges on the snowmobile trail known as “Corridor 19” (on McDonough Brook Rd/Country Rd.) also known as Nation Forest Service Road 244 in Chatham NH within the White Mountain National Forest (WMNF).
  • Snowmobile Bridge Engineering RFQ

  • Asphalt Shingle Roof Replacement


    The Project will be awarded to Triple Construction LLC in the amount of $38,790.
    Bid List

    Location: Fernald Station, 64 Governor Wentworth Highway Route 109, Wolfeboro, NH
    Project #: CAP-2203
    Mandatory Prebid: September 20, 2022 at 10:00 am 
    Bids Due: September 29, 2022 at 2:00 pm. 
    Anticipated Start Date: October 19, 2022
    Completion Date: no later than June 30, 2023

  • CAP-2203 Sheet1
  • CAP-2203 Sheet 2
  • CAP-2203 Specifications
  • CAP-2203 Addendum 1
  • CAP-2203 Addendum 2
  • Plans and Specifications located on NH Dept. of Administrative Services site


    Previous RFP and Project Bids

  • ARP 2107 Bid List
  • CAP 2101 Bid List
  • CAP-2137 Bid List
  • HB03-21 Bid List
  • HB02-21 Bid List
  • HIS-1801 Bid List
  • PR-1800 Bid List
  • CAP-1802 Bid List
  • PR 2102 Bid List

  • The below forms should be used in any project posted:

  • Certificates of Authority:
  • Vendor Application and W9  
  • P-37 Standard Contract Form
  •  